Heavy vehicles and vehicles more than 2.8m in height will be restricted entry from both bounds of Sion railway overbridge (ROB) from June 29 to July 13 as Central railway has declared it dangerous.

Vehicles from BA Road towards LBS Marg and Sant Rohidas Marg will be diverted from Kurla to Western Express Highway (WEH), Bandra, Kumbharwada junction, 60 Ft Road, Khemkar Chowk, right turn to Sion-Mahim Link Road T-Junction.

Source Link : https://timesofindia.indiatimes.com/city/mumbai/restriction-on-heavy-vehicles-at-sion-rob-for-two-weeks/articleshow/111326547.cms

  Queries and Comments

Share



Report this Post
comments powered by Disqus

Related

Central Railway mega block on Harbour and main Line on 15th September

Central Railway (CR) will operate Mega Block on its Suburban sections on Sunday 15th September to carry out various engineering and maintenance works including maintenance of tracks, signaling, and overhead equipment, that are essential for infrastructure… Mumbai

5-hour Jumbo block between Borivali-Ram Mandir station on 30th June

The Western Railways will operate a 5-hour-long block on up and down fast lines between Borivali and Ram Mandir railway station from 10 am to 3 pm on Sunday, 30 June.  The massive block would be operated to carry out the maintenance work. The railway… Mumbai

Arch bridge linking Nariman Point to Bandra to open by 15th September in Mumbai

Another phase of the much-awaited coastal road is set to open this month.  The Brihanmumbai Municipal Corporation (BMC) has informed that the South bound arm connecting Bandra Worli Sea Link (BWSL) to Marine Drive will likely be opened by September 15. … Mumbai

Western Railway to convert 10 Trains to 15-Coach from 1st October

Western Railway to convert 10 Trains to 15-Coach from 1st October. Additionally, starting October 1, the Mumbai division of (WR) will also introduce 12 new services, increasing its total daily services from 1,394 to 1,406. At present, 199 trips of 15… Mumbai

BEST issued diversion in Bus Routes after Sion ROB closure in Mumbai

The closure of Sion ROB has forced the Brihanmumbai Electric Supply and Transport (BEST) Undertaking to make extensive revisions to its bus routes. In anticipation of the bridge's closure, heavy vehicle movement was restricted starting in June.… Mumbai


Follow us